Skip to main content

What the Coastal Act means for beach access

The public has a constitutional right to the shoreline below the mean high tide line, and a statutory framework designed to make reaching it possible.

Energy & Infrastructure Editor

· 2 min read

The California coastline.
The California coastline.Bureau of Land Management · Public domain · via Wikimedia Commons

California's beach access rules rest on two separate ideas: that the wet sand belongs to the public, and that a right you cannot reach is not a right.

Where the public boundary sits

Land seaward of the mean high tide line is held in public trust. That boundary is defined by tidal averages rather than by a visible line, which is why it moves and why disputes about it require a surveyor.

Above that line, the dry sand may be private, and in many places it is. The public right to walk along the shoreline exists below the boundary, regardless of who owns the land above it.

Getting there

The Coastal Act requires that development in the coastal zone maximise public access. In practice that has been implemented through several mechanisms.

**Permit conditions.** Approval of coastal development is routinely conditioned on dedicating a lateral easement along the shoreline, or a vertical easement providing a path from the road to the beach.

**Offers to dedicate.** Historic conditions produced offers to dedicate access that had to be accepted by an agency to become operative. Many sat unaccepted for years, and clearing that backlog opened a number of accessways.

**Prescriptive rights.** Where the public has used a route openly and continuously for a long period, a prescriptive right may arise. These are fact-intensive and litigated.

Coastal development permits

Most development in the coastal zone requires a coastal development permit, issued by the local government under a certified local coastal programme, or by the Coastal Commission where none is certified, with appeal rights to the Commission in defined circumstances.

Development is defined broadly. Placing a gate, a fence, a sign or rocks can constitute development requiring a permit, which is why unpermitted access barriers are the most common enforcement matter on the coast.

A private beach sign is not a legal instrument. Quite often it is the evidence in the enforcement file.

Enforcement

The Commission can order removal of unpermitted development and impose administrative penalties, including specific penalties for violations that impede public access. Those powers changed the economics of simply keeping a gate closed and waiting.

Practical points

  • Use designated accessways where they exist; mapped inventories are published.
  • Stay below the high tide line when passing private frontage.
  • Report blocked or gated public accessways to the Commission rather than forcing entry.
  • For coastal property owners: check whether an easement or offer to dedicate encumbers the parcel before doing anything with the frontage.

Related