Productions filming on California streets and public property must obtain permits, carry insurance, and meet strict approval timelines. Here's how the process and fees work.

Editorial Staff

· 4 min read

Hollywood Walk of Fame star for The Doors
The Doors star on the Hollywood Walk of Fame, Los AngelesDietmar Rabich · CC BY-SA 4.0 · via Wikimedia Commons

Any production filming on-location in California—whether on public streets, parks, or private property—needs a permit from the local film commission or authority overseeing that jurisdiction. In Los Angeles County, FilmLA handles most permitting. The permit system requires productions to obtain insurance, pay fees based on the scope of activity, and submit applications well in advance of the shoot date. Understanding how these requirements work shapes the timeline and budget for location-based entertainment production.

FilmLA serves the City of Los Angeles, unincorporated Los Angeles County, and several incorporated cities including Culver City and others. Each jurisdiction has slightly different requirements, but the core structure—application fees, insurance mandates, and processing timelines—follows a consistent pattern designed to protect neighborhoods and manage traffic and safety impacts.

What the permit costs

The baseline FilmLA permit application fee is $931 for a standard permit covering up to five locations over seven consecutive days. This is the starting point for most narrative films, television productions, and commercials. Additional fees layer on depending on what the production does.

A permit rider—a single-day or partial-period extension to an existing permit—costs $148.75 during business hours or $208 after hours or on weekends. If a production needs to notify residents beyond a base radius, the notification fee adds $232. Specialized activities each carry their own charges: lane closures, gunfire, special effects, drone use, or helicopter operations each cost $78 per location. A FilmLA monitor on set costs $44.50 per hour.

Still photography permits cost $104 for the application and $31 for a rider. Student productions pay $52 for a simple permit or $134 for a complex one. Non-profit and public service announcements pay $73 for the application and $36 for a rider.

Fees have increased regularly. Effective November 2024, the hourly rate for a Uniformed Fire Safety Officer rose to $127 per hour. These costs are passed to productions.

Insurance requirements before permit issuance

FilmLA will not issue a permit without proof of insurance on file. For motion picture filming, the minimum general liability coverage is $1 million per occurrence. Still photography requires a minimum of $500,000 in the City of Los Angeles, or $1 million in Los Angeles County; aircraft use requires $5 million.

If a production uses vehicles, auto liability insurance of at least $1 million per accident must cover owned, hired, and non-owned vehicles. Drone and unmanned aircraft systems require $2 million minimum coverage with aircraft specifically listed. State law requires proof of workers' compensation coverage; productions with no employees may submit an exemption waiver instead.

Certificates of insurance must name FilmLA, as well as the city or county where filming takes place, as an additional insured, submitted via an ACORD 25 Certificate of Liability Insurance. For filming on state property, the certificate must name 'the State of California, including its officers, agents and employees.' The California Film Commission maintains a list of entertainment insurance brokers for producers unfamiliar with the requirement.

Application deadline and approval timeline

All FilmLA permit applications must be submitted by 10 a.m. through MyFilmLA, the online permit system. The city and county both enforce a minimum of three full business days between submission and the first day of filming—not counting the day the application was submitted.

This means a production wanting to film on Saturday, Sunday, or Monday must submit by 10 a.m. Wednesday of the week before. To film on Tuesday, submit by 10 a.m. Thursday of the week before. The three-day window allows time for FilmLA staff, city departments, and the fire department to review the application and any community notification.

High-impact activities extend this timeline. Shoots involving stunts, special effects, gunfire, aerial work, or street closures require four to seven business days of advance notice. Filming in city parks requires at least four business days. Most Los Angeles County offices close on Fridays.

The three-business-day minimum applies to unincorporated county areas as well, though some county departments may ask for additional time. Productions should contact FilmLA early in pre-production to understand the specific timelines for their shoot location and activity type.

“The three-day window allows time for FilmLA staff, city departments, and the fire department to review the application and any community notification.”

Where and when productions can film

Los Angeles permits standard filming from 7 a.m. to 10 p.m. Monday through Friday and 9 a.m. to 10 p.m. on weekends. Any filming outside these hours may require evidence of community support, typically through a neighborhood filming survey showing resident approval.

Unincorporated Los Angeles County follows a similar schedule. Some incorporated cities within FilmLA's service area—such as Culver City—may have different requirements or stricter conditions. A production planning to film across multiple jurisdictions should check each location's specific rules, as fees and application procedures can vary.

FilmLA's online system allows producers to look up area-specific requirements before submitting an application. This prevents delays from submitting incomplete applications or misunderstanding local codes. The same applies to specialized filming, such as beach filming or freeway work, which may require additional approvals beyond the standard permit.

What production companies should know

The permit requirement applies to all on-location filming of a commercial nature on public and private property. Documentaries, independent films, commercials, television episodes, and studio productions all need permits. Student films and certain non-profit productions are not exempt from this requirement, but they qualify for reduced-fee permits.

Obtaining the permit is the production company's or line producer's responsibility. The cost of the permit, insurance, and monitors is typically budgeted as a production expense. Large productions often hire a location manager or permit coordinator to handle the application and keep up with the timelines.

Because the three-business-day window is a minimum, not a guarantee of immediate approval, producers should submit applications as early as possible. Unexpected hold-ups—missing insurance documents, community objections, or department questions—can delay approval. Planning shooting schedules with extra days as a buffer protects against timeline slippage caused by the permitting process.

Related coverage: What film completion bonds guarantee, and why financiers require them; How film production incentives compare across states.

Related

Cover story

RJ Scaringe

RJ Scaringe's Road to Profit Runs Through the Rivian R2. Can He Close the Gap With Tesla?